calendar | sized drag & drop JavaScript event calendar | Calendar library
kandi X-RAY | calendar Summary
kandi X-RAY | calendar Summary
Full-sized drag & drop JavaScript event calendar with resource view:. Inspired by FullCalendar, implements similar options.
Support
Quality
Security
License
Reuse
Top functions reviewed by kandi - BETA
- Create default options
- Fetches all events that are fetches
- Takes an array of day chunks and returns a sorted array .
- Return active range of active dates
- Creates a view limiter time limits .
- Groups events chunks within a given array .
- Create event content for given chunk .
- Format a date .
- Shared resources for resources
- create duration object
calendar Key Features
calendar Examples and Code Snippets
Community Discussions
Trending Discussions on calendar
QUESTION
I am trying to capture video via Gallery or via Camera. I am able to successfully fetch the video from Gallery. However when I try to record the video from camera it loses the track and I am unable to fetch the path. It does save the video on path. The log give following error/warning. Why is is losing track of the video recorder? Where am I going wrong?
...ANSWER
Answered 2022-Mar-22 at 18:12I don't know if it will help but maybe you should do startActivityForResult or ActivtyResultLauncher. I would comment that if I had enough reputation.
QUESTION
When switching from Glue 2.0 to 3.0, which means also switching from Spark 2.4 to 3.1.1, my jobs start to fail when processing timestamps prior to 1900 with this error:
...ANSWER
Answered 2022-Feb-10 at 13:45I made it work by setting --conf
to spark.sql.legacy.parquet.int96RebaseModeInRead=CORRECTED --conf spark.sql.legacy.parquet.int96RebaseModeInWrite=CORRECTED --conf spark.sql.legacy.parquet.datetimeRebaseModeInRead=CORRECTED --conf spark.sql.legacy.parquet.datetimeRebaseModeInWrite=CORRECTED
.
This is a workaround though and Glue Dev team is working on a fix, although there is no ETA.
Also this is still very buggy. You can not call .show()
on a DynamicFrame
for example, you need to call it on a DataFrame
. Also all my jobs failed where I call data_frame.rdd.isEmpty()
, don't ask me why.
Update 24.11.2021: I reached out to the Glue Dev Team and they told me that this is the intended way of fixing it. There is a workaround that can be done inside of the script though:
QUESTION
The 3rd March 2022 is the end of this Hijri Month (month of Rajab for this year 1443 AH); i.e. 30 Rajab 1443 AH.
The month of Rajab for the year 1443 AH is 30 days in accordance with the Islamic (Hijri) Calendar in accordance with all websites, applications, MS Office, and Windows calendars.
When using the javascript Intl.DateTimeFormat()
to display the Islamic (Hijri) date for the 3 March 2022 using the islamic
calendar option, it will give the Islamic Hijri Date of (1 Shaʻban 1443 AH). This result is one day after the month of Rajab (i.e. the 1st of the following month) and it calculated the month Rajab to be 29 days rather than 30 days.
However, if the option passed to the Intl.DateTimeFormat()
is ar-SA
(i.e. arabic-Saudi Arabia), it will give the correct result. This is strange because the ar-SA
locale uses the Islamic (Hijri) calendar by default.
Is this an error/bug or is it the correct internal workings of javascript?
Is there a more robust method to get the Islamic Date in Javascript other than using the 'ar-SA' locale (but not using external libraries)?
See the code example below:
I have tested this in node and chrome and it gives the same resulting discrepancy.
...ANSWER
Answered 2022-Feb-06 at 07:29There are three possible reasons for the "off by one" date problems you're seeing:
- Time zone mismatch between date initialization and date formatting
- Using the wrong variation of the Islamic calendar (JS implementations typically offer 5 different Islamic calendars!)
- Bugs in the ICU library used for JS's calendar calculations
I'll cover each of these below.
1. Time zone mismatch between date initialization and date formatting
The most common reason for off-by-one-day errors is (as @RobG noted in his comments above) a mismatch between the time zone used when declaring the Date
value and the time zone used when formatting it in your desired calendar.
When you initialize a Date instance using an ISO 8601 string, the actual value stored in the Date instance is the number of milliseconds since January 1, 1970 UTC. Depending on your system time zone, new Date('2022-02-03')
can be February 3 or February 2 in your system time zone. One way to evade this problem is to use UTC when formatting too:
QUESTION
I used version 2.4.0-alpha04
to conveniently use multi-backstack
of navigation
. (develop docs)
But I got the following error:
...ANSWER
Answered 2021-Jul-31 at 20:28in your app level build.gradle file replace
QUESTION
EDIT Keep in mind that each cell can have a different width and height. This is not the same thing as this post: CSS-only masonry layout, see guide lines of the reference picture:
there are about 19 columns and 17 rows made by guide lines and tiles placed in virtual 5×5 base grid overlap it in both axis.
I want something between a grid and a flex layout. Grids are limited by cell size and flex is more powerful, but (what I know of it) is limited to direction. I want to have different cell sizes, each 5 of them summing to the same width, and 5 columns summing to the same height. Like the image below.
Is there any way of achieving a similar layout using CSS?
This is all I got until now:
HTML:
...ANSWER
Answered 2021-Dec-25 at 17:08CSS GRID
new answer
complete explanation in the previous answer below...
use also negative margin for the top ones like (1,4,19) and positive margin for the bottom ones
QUESTION
I am looking into ant design calendar documentation.
I want to set events in specific days in current month. I am using this code which provide ant design documentation. But in their code created events were shown in every month.
How can I show for example in April only?
Because in my case I should receive from backend list of events in different years, months and dates and show in calendar.
Here is ant design documentation code
...ANSWER
Answered 2022-Jan-10 at 10:52Each value has sent to getListData
is a moment object related to a specific day on the calendar view, so you can parse it as the same date format in your backend response, and decide what you want to render in that speceific day. here is an example:
QUESTION
I've updated bootstrap from version 3 to 4 and noticed the calendar is overlapping when creating it with js instead of cshtml. There's no need to go back more than a few days so I would like to disable the month button that changes the view mode to months or years. Is there a specific CSS property that I need or would I need to edit a code in the library?
...ANSWER
Answered 2021-Oct-08 at 16:29That will depend entirely on which datetimepicker component you are using.
This one lets you set the maximum view:
QUESTION
I am developing an Android app for an Ethiopian company and have to deal with dates.
The calendar used in Ethiopia is similar to the Gregorian one but has two main differences: it's set approx. 7 years earlier and has 13 months. At the time I post this question the date is 13-09-2021 in the Gregorian calendar and 03-01-2014 in the Ethiopian one.
My questions are:
does Android support the Ethiopian calendar and is it customary for people in Ethiopia to have their devices use it?
if so, do I have to get the default formatter (that uses the default calendar:
Calendar.getInstance()
) in order to format the date properly?instead, if the device uses the Gregorian calendar how does Java support the translation to the Ethiopian date?
What would you suggest in order to simulate the full scenario, with the device set with the proper current Ethiopian date (as if coming from the network provider) and locale?
...ANSWER
Answered 2021-Sep-14 at 08:14While I know nothing about these calendaring systems, perhaps…
ThreeTen-ExtraAdd the ThreeTen-Extra library to your project to access the EthiopicChronology
class that plugs into the java.time framework bundled with Android.
This chronology defines the rules of the Ethiopic calendar system. This calendar system is primarily used in Ethiopia. Dates are aligned such that 0001-01-01 (Ethiopic) is 0284-08-29 (ISO).
You can also find a CopticChronology
class there too.
QUESTION
We have a situation in a Woocommerce Subscriptions set up where the default sync options won't work. I've created a manual calendar that my functions.php
file references at subscription creation time, but it only ever checks at subscription creation and then the plugin automatically sets the next renewal to be every 4 weeks thereafter.
I need to fire my renewal date checker function after each subscription creation and/or renewal to calculate the next renewal date from my calendar. I know there are at least two hooks I could try, being:
wcs_renewal_order_created
and woocommerce_subscription_payment_complete
, but I don't know enough about when those are triggered to know which is the safest.
About woocommerce_subscription_payment_complete
, the WC Subscriptions documentation says:
Triggered when a payment is made on a subscription. This can be payment for the initial order or a renewal order. It is important to note, however, that subscription date changes related to early renewals are processed differently than other renewals, so this action should not be relied upon for capturing the next payment date on a subscription.
I'm not 100% sure what case they refer to in their note, but it was enough to give me pause.
About wcs_renewal_order_created
, I am unclear as to when this fires:
These orders are always created through the wcs_create_renewal_order() function, regardless of whether they are created for a scheduled renewal event, manually via the WooCommerce > Edit Subscription administration screen, or via the Subscriptions endpoints for the WooCommerce REST API. Because of this, it’s possible to add, remove or update the value of anything on that renewal order using this filter.
For example, this can be used to add a discount to specific renewal orders, like the 12th order each year. It could also be used to add one-time fee for a certain renewal order, like a special annual extra fee on a monthly subscription.
Would trying to set the next_date
key via update_dates()
during this hook push the current payment it was about to process or has it already happened and so setting the next date is now safe?
What is the most reliable way to set the next renewal date programmatically immediately after the current period has been processed for a given subscription?
...ANSWER
Answered 2021-Jul-15 at 18:51Disclaimer: I share my reasoning and preliminary information, I did not do any practical check.
Based on the description, both hooks are not related to the events that are required: wcs_renewal_order_created
responds to the creation of a subscription order, and woocommerce_subscription_payment_complete
responds to payment for such an order. But both of these points are responsible for the "bookkeeping rationale" of the creating or renewing a subscription, not for the creation or renewal itself.
I suggest testing the woocommerce_helper_subscription_activate_success
hook, which can be found in the class-wc-helper.php:
QUESTION
I have a SwiftUI app with a widget. When I run the app via Xcode (either straight to my device or on the simulator), the widget works exactly as expected.
However, when I run the app through TestFlight, the widget does appear, but it does not show any data -- it's just the empty placeholder. The widget is supposed to show an image and some text, but it shows neither.
I've seen some posts on Apple Developer forums about similar problems. One accepted answer says the following:
- Make sure that you use Xcode 12 beta 4 and iOS 14 beta 4 on your devices. Make sure that you have placeholder(in:) implemented. Make sure that you don't have placeholder(with:) because that's what the previous beta of Xcode was suggesting with autocompletion and without that you won't get your placeholder working. I think this whole problem is caused by the WidgetKit methods getting renamed but that's another story.
- As per the release notes, you need to set "Dead Code Stripping" to NO in your extension target's build settings. This is only necessary for the extension's target.
- When uploading your archive to the App Store Connect, uncheck "Include bitcode for iOS content".
- Delete your old build from a device when installing a new beta.
I've implemented these suggestions, to no avail.
Here's my code for the widget. It first fetches game data via CloudKit, then creates a timeline:
...ANSWER
Answered 2021-May-22 at 18:23Did you try to deploy the cloudkit container to the production? You can find it on the CloudKit Dashboard.
Community Discussions, Code Snippets contain sources that include Stack Exchange Network
Vulnerabilities
No vulnerabilities reported
Install calendar
Support
Reuse Trending Solutions
Find, review, and download reusable Libraries, Code Snippets, Cloud APIs from over 650 million Knowledge Items
Find more librariesStay Updated
Subscribe to our newsletter for trending solutions and developer bootcamps
Share this Page