dates | The AirBnB 's date picker done in web components | Date Time Utils library
kandi X-RAY | dates Summary
kandi X-RAY | dates Summary
Basic Datepicker WebComponent inspired by AirBnB's react-dates.
Support
Quality
Security
License
Reuse
Top functions reviewed by kandi - BETA
Currently covering the most popular Java, JavaScript and Python libraries. See a Sample of dates
dates Key Features
dates Examples and Code Snippets
const isBetweenDates = (dateStart, dateEnd, date) =>
date > dateStart && date < dateEnd;
isBetweenDates(
new Date(2010, 11, 20),
new Date(2010, 11, 30),
new Date(2010, 11, 19)
); // false
isBetweenDates(
new Date(2010, 11
const countWeekDaysBetween = (startDate, endDate) =>
Array
.from({ length: (endDate - startDate) / (1000 * 3600 * 24) })
.reduce(count => {
if (startDate.getDay() % 6 !== 0) count++;
startDate = new Date(startDate.setDate(
private static int printAndCountDates(Result res) {
// a correct run should deliver 5 times 15.12.2015 per each thread
var counter = 0;
for (var dt : res.getDateList()) {
counter++;
var cal = Calendar.getInstance();
cal.
public static boolean isSameDayUsingJoda(Date date1, Date date2) {
org.joda.time.LocalDate localDate1 = new org.joda.time.LocalDate(date1);
org.joda.time.LocalDate localDate2 = new org.joda.time.LocalDate(date2);
return localD
public void iterateBetweenDatesJava8(LocalDate start, LocalDate end) {
for (LocalDate date = start; date.isBefore(end); date = date.plusDays(1)) {
processDate(date);
}
}
Community Discussions
Trending Discussions on dates
QUESTION
I have basically this very odd type of data frame:
The first column is the name of the States (say I have 3 states), the second to the last column (say I have 5 columns) contains some values recorded at different dates (not continuous). I want to create a graph that plots the values for each State on the range of the dates that starts from the earliest and end in the latest dates (continuous).
The table looks like this:
state 2020-01-01 2020-01-05 2020-01-06 2020-01-10 AZ NA 0.078 -0.06 NA AK 0.09 NA NA 0.10 MS 0.19 0.21 NA 0.38"NA" means there is not data.
How do I produce this graph in which the x axis is from 2020-01-01 to 2020-01-10 (continuous), the y axis contains the changing values (as points) of the three States, each state occupies its separate (segmented) y-axis?
Thank you.
...ANSWER
Answered 2021-Jun-16 at 03:41You can get the data into a long format, which makes it easier to plot. R will make it difficult to read column names that start with a number. While reading the data, ensure that you have check.names = FALSE
so that column names are read as is.
QUESTION
I wanted to insert my data to a specific sheet name based on form input value of "svdate":
...ANSWER
Answered 2021-Jun-16 at 02:12I thought that in your situation, it is required to retrieve 6/17
from 06/17/2021
. For this, how about the following modification?
In this case, please modify doPost
as follows.
QUESTION
I'm new to Python. I have a dictionary where some fields are dates ( datetime.datetime
type) and I need to use comprehension to convert those to MM/DD/YYYY strings in a new cloned dictionary.
I was getting started with
...ANSWER
Answered 2021-Jun-16 at 02:15You can use a conditional expression:
QUESTION
I have the wackiest bug. Like....the wackiest! If any of ya'll want to put eyes on this, awesomesauce! I really appriciate it! I am creating a survey with REACT, Redux, SQL, HML, Material-ui, and CSS.
I've created a graph of information with am4charts using data from a database. Everything is working and will show up on the page......but not on page load. What I am seeing in my console is that the page will load, it fires off my get request but doesn't return with the data fast enough (I think). By the time that the get request loads, my graph has populated with no data.
Here is the code that I have for the page that I am rendering. What is really odd is that, once my code has run, I can cut a line of code (I've been using a console log). And then the graph will render and load.
...ANSWER
Answered 2021-Jun-15 at 22:40Can you try this fix? I created new functions for some tasks.
https://codesandbox.io/s/vigorous-varahamihira-6j588?file=/src/App.js
QUESTION
I am trying to generate a table to record articles published each month. However, the months I work with different clients vary based on the campaign length. For example, Client A is on a six month contract from March to September. Client B is on a 12 month contract starting from February.
Rather than creating a bespoke list of the relevant months each time, I want to automatically generate the list based on campaign start and finish.
Here's a screenshot to illustrate how this might look:
Below is an example of expected output from the above, what I would like to achieve:
Currently, the only month that's generated is the last one. And it goes into A6 (I would have hoped A5, but I feel like I'm trying to speak a language using Google Translate, so...).
Here's the code I'm using:
...ANSWER
Answered 2021-Jun-15 at 11:11Make an Array with the month names and then loop trough it accordting to initial month and end month:
QUESTION
I'm trying to create an app that meets two random users in Django. my question is how to create an object Meeting out of 2 random users from my User model, I want something like a for loop so that every 2 users in my database have a meeting!
ps: I have only one day left to submit my work I will be so thankful if u help me
this is my code so far:
...ANSWER
Answered 2021-Jun-15 at 21:48I can't decipher what you're doing there, but:
QUESTION
**I am trying to write the code for getting the date in required format , I have got the dates but how to add the required time with it , here I have
startDate - 1/08/2021 00:00:00 , EndDate - 20/08/2021 23:59:59 , increment days: 10
and the Expected output is :
...ANSWER
Answered 2021-Jun-15 at 12:58Use the date-time API.
(The code should be self-explanatory.)
QUESTION
I have bitcoin historical data. I split the "DATE" Colum as "year month days and hour" because I wanted to sort data based on hours["AS it is hourly base data"]. the data goes up to 2021-12 ie Decmber["the dates goes from 1 to 30 every month"]. I want to sort this data further as:- "2019-Jan, 2020-Jan 20201-Jan" then "2019-Feb,2020-Feb, 2021-Feb" and soon on
Year Month DAy Hour open high low close 2019 1 1 0 3700.05 3725.58 3698.83 3715.09 2019 2 1 0 3700.05 3725.58 3698.83 3715.09 2019 3 1 0 3700.05 3725.58 3698.83 3715.09 2019 4 1 0 3700.05 3725.58 3698.83 3715.09 2019 5 1 0 3700.05 3725.58 3698.83 3715.09can this be done by saying I have split the "DATE" column? if YES please any suggestion on how this can be achieved
The original "DATE" colum was as follows :- 2019-01-01T00:00:00Z
...ANSWER
Answered 2021-Jun-15 at 18:58You can first sort with respect to Month
and then Year
:
QUESTION
ANSWER
Answered 2021-Jun-15 at 18:56This is due to a long-standing issue with how Presto models timestamps. Long story short, the implementation of timestamps is not compliant with the SQL specification and it incorrectly attempts to treat them as "point in time" or "instant" values and interpret them within a time zone specification. For some dates and time zone rules, the values are undefined due to daylight savings transitions, etc.
This was fixed in recent versions of Trino (formerly known as Presto SQL), so you may want to update.
By the way, you can convert a varchar
to a date
using the date()
function or by casting the value to date
:
QUESTION
I have a table with a date and an ID field. An extract is set out below. I would like to run a query to return all records where the same ID appears on consecutive dates. There may be no consecutive dates or two or more consecutive dates.
Here is the extract:
Date No_ID 09/06/2021 24694000 09/06/2021 20102886 09/06/2021 12873514 09/06/2021 21307300 09/06/2021 13310606 10/06/2021 24694000 10/06/2021 14590427 10/06/2021 23520905 10/06/2021 7424945 10/06/2021 11437404 10/06/2021 12873514Desired output:
Date No_ID 09/06/2021 24694000 09/06/2021 12873514 10/06/2021 24694000 10/06/2021 12873514 ...ANSWER
Answered 2021-Jun-15 at 08:32Consider:
Community Discussions, Code Snippets contain sources that include Stack Exchange Network
Vulnerabilities
No vulnerabilities reported
Install dates
Bower: bower install git@github.com:pankajpatel/dates.git --save
npm: npm install pankajpatel/dates --save
Support
Reuse Trending Solutions
Find, review, and download reusable Libraries, Code Snippets, Cloud APIs from over 650 million Knowledge Items
Find more librariesStay Updated
Subscribe to our newsletter for trending solutions and developer bootcamps
Share this Page