Top functions reviewed by kandi - BETA
- Returns the available currencies .
- Returns the base definitions .
- Format a number .
- Rounds a number .
- Validate options .
- Canonicalizes a locale .
- Get a currency .
- Returns a language .
- Returns the numberingSystem .
- Returns the language code .
intl Key Features
intl Examples and Code Snippets
Community Discussions
Trending Discussions on intl
QUESTION
running Intl.NumberFormat('en-IN',{ style: 'currency', currency: 'USD' }).format(5000)
returns US$5,000.00 on one machine but just $5,000.00 on another machine. Why is that so?
ANSWER
Answered 2022-Mar-30 at 07:59I found out it was due to different node versions, but it doesn't make a lot of sense to me that upgrading node versions actually changes the output of a string formatting library, when the point of string formatting functions should be to expect consistent output.
QUESTION
My flutter app run well, but when I try to upload the app to App Store by archive it:
Xcode -> Product -> Archive
it failed and get two errors
First one in flutter_inappwebview with following error message:
ANSWER
Answered 2022-Mar-22 at 07:22Downgrading Xcode from 13.3 to 13.2.1 solved my problems.
QUESTION
I want to create my launcher icon for flutter. My config (pubspec.yaml) looks the following.
...ANSWER
Answered 2022-Jan-07 at 06:45In your project go to android/app/build.gradle and change the minSdkVersion and targetSdkVersion to integer values.
QUESTION
The 3rd March 2022 is the end of this Hijri Month (month of Rajab for this year 1443 AH); i.e. 30 Rajab 1443 AH.
The month of Rajab for the year 1443 AH is 30 days in accordance with the Islamic (Hijri) Calendar in accordance with all websites, applications, MS Office, and Windows calendars.
When using the javascript Intl.DateTimeFormat()
to display the Islamic (Hijri) date for the 3 March 2022 using the islamic
calendar option, it will give the Islamic Hijri Date of (1 Shaʻban 1443 AH). This result is one day after the month of Rajab (i.e. the 1st of the following month) and it calculated the month Rajab to be 29 days rather than 30 days.
However, if the option passed to the Intl.DateTimeFormat()
is ar-SA
(i.e. arabic-Saudi Arabia), it will give the correct result. This is strange because the ar-SA
locale uses the Islamic (Hijri) calendar by default.
Is this an error/bug or is it the correct internal workings of javascript?
Is there a more robust method to get the Islamic Date in Javascript other than using the 'ar-SA' locale (but not using external libraries)?
See the code example below:
I have tested this in node and chrome and it gives the same resulting discrepancy.
...ANSWER
Answered 2022-Feb-06 at 07:29There are three possible reasons for the "off by one" date problems you're seeing:
- Time zone mismatch between date initialization and date formatting
- Using the wrong variation of the Islamic calendar (JS implementations typically offer 5 different Islamic calendars!)
- Bugs in the ICU library used for JS's calendar calculations
I'll cover each of these below.
1. Time zone mismatch between date initialization and date formatting
The most common reason for off-by-one-day errors is (as @RobG noted in his comments above) a mismatch between the time zone used when declaring the Date
value and the time zone used when formatting it in your desired calendar.
When you initialize a Date instance using an ISO 8601 string, the actual value stored in the Date instance is the number of milliseconds since January 1, 1970 UTC. Depending on your system time zone, new Date('2022-02-03')
can be February 3 or February 2 in your system time zone. One way to evade this problem is to use UTC when formatting too:
QUESTION
Please help me.
Error -
i18next::pluralResolver: Your environment seems not to be Intl API compatible, use an Intl.PluralRules polyfill. Will fallback to the compatibilityJSON v3 format handling
Code -
...ANSWER
Answered 2021-Dec-29 at 17:31Look like an issue on android.
QUESTION
I have upgraded my angular to angular 13. when I run to build SSR it gives me following error.
...ANSWER
Answered 2022-Jan-22 at 05:29I just solve this issue by correcting the RxJS version to 7.4.0
. I hope this can solve others issue as well.
QUESTION
Using Python on an Azure HDInsight cluster, we are saving Spark dataframes as Parquet files to an Azure Data Lake Storage Gen2, using the following code:
...ANSWER
Answered 2021-Dec-17 at 16:58ABFS is a "real" file system, so the S3A zero rename committers are not needed. Indeed, they won't work. And the client is entirely open source - look into the hadoop-azure module.
the ADLS gen2 store does have scale problems, but unless you are trying to commit 10,000 files, or clean up massively deep directory trees -you won't hit these. If you do get error messages about Elliott to rename individual files and you are doing Jobs of that scale (a) talk to Microsoft about increasing your allocated capacity and (b) pick this up https://github.com/apache/hadoop/pull/2971
This isn't it. I would guess that actually you have multiple jobs writing to the same output path, and one is cleaning up while the other is setting up. In particular -they both seem to have a job ID of "0". Because of the same job ID is being used, what only as task set up and task cleanup getting mixed up, it is possible that when an job one commits it includes the output from job 2 from all task attempts which have successfully been committed.
I believe that this has been a known problem with spark standalone deployments, though I can't find a relevant JIRA. SPARK-24552 is close, but should have been fixed in your version. SPARK-33402 Jobs launched in same second have duplicate MapReduce JobIDs. That is about job IDs just coming from the system current time, not 0. But: you can try upgrading your spark version to see if it goes away.
My suggestions
- make sure your jobs are not writing to the same table simultaneously. Things will get in a mess.
- grab the most recent version spark you are happy with
QUESTION
I am trying to use firebase-server-timestamp
to show the user when he/she send their order to us.
The problem I encounter is, that the server-timestamp
is showing a wrong time (e.g: Current time is 12:30, but timestamp shows 12:15).
How is that possible?
ANSWER
Answered 2021-Nov-25 at 11:59I'm not sure but I think I've seen this happen before and in that case (but I might be wrong here) I think the emulator/phone where the app is running on had the wrong date/time set. So Timestamp now was wrong as well.
QUESTION
Program description: I'm making a simple timetable program with Vue.js. The page has a "calendar" (a table of 7 columns, where each column correspond to a specific date) and a button on the bottom of each calendar column. On clicking a button a modal should pop up with a specific date in its body-content. The date in the body-content of the modal should be the same as in date in the column title, where the button is placed. Dates can also be changed on click of a forward
or backward
button. When clicking forward
all dates shift one day forward. In case of backward
all dates shift one day backward.
Approach to the program: I have a parent component App.vue
and a child component for the modal modal.vue
. In the parent component as one of the attributes I have array dateArr
which contains 7 different dates in the following format: ['9/11/21', '9/12/21', ..., '15/11/21']
. On App.vue
mount getDatesArray
method is being called which fills dateArr
attribute with dates. On clicking backward
and forward
currentOffset
is being changed and getDatesArray
method is being triggered. The first row of the table consists of dates, therefore I create it with v-for
and iterate over each date
in dateArr
. The body of the table consists of 3 rows in each column. The last row in each column contains a unique button and a modal. In the last row I want to bind each component to a specific date, so I yet again iterate over each date
in dateArr
. The modal component has a slot in it, where I put unique date
from dateArr
. On click of the button the visibility of the modal changes with change
method.
Problem: Everything works well, however, whatever button I click, the content (date
) of the modal component stays the same: 15/11/21
, which is the last element of the array. The purpose of the program is to have unique content (date
) inside each modal component with the core attribute (dateArr
) being dynamic. I've tried implementing different solutions to this problem, but none were of use. I will really appreciate any help!
App.vue
:
ANSWER
Answered 2021-Nov-09 at 11:05The first thing I thought about is to pass an index to change function, thus calculating some value independent of the v-for loop:
QUESTION
I need to add imagemagick into my php 7.4 docker, so in file Dockerfile.yml I added :
...ANSWER
Answered 2021-Oct-11 at 07:29The message
Community Discussions, Code Snippets contain sources that include Stack Exchange Network
Vulnerabilities
No vulnerabilities reported
Install intl
PHP requires the Visual C runtime (CRT). The Microsoft Visual C++ Redistributable for Visual Studio 2019 is suitable for all these PHP versions, see visualstudio.microsoft.com. You MUST download the x86 CRT for PHP x86 builds and the x64 CRT for PHP x64 builds. The CRT installer supports the /quiet and /norestart command-line switches, so you can also script it.
Support
Reuse Trending Solutions
Find, review, and download reusable Libraries, Code Snippets, Cloud APIs from over 650 million Knowledge Items
Find more librariesStay Updated
Subscribe to our newsletter for trending solutions and developer bootcamps
Share this Page