CircularProgressBar | Circular ProgressBar is a custom control | User Interface library
kandi X-RAY | CircularProgressBar Summary
kandi X-RAY | CircularProgressBar Summary
Circular ProgressBar is a custom control and inplace replacement of 'ProgressBar' for WinForm with animation.
Support
Quality
Security
License
Reuse
Top functions reviewed by kandi - BETA
Currently covering the most popular Java, JavaScript and Python libraries. See a Sample of CircularProgressBar
CircularProgressBar Key Features
CircularProgressBar Examples and Code Snippets
Community Discussions
Trending Discussions on CircularProgressBar
QUESTION
I've got a number located in result.score
. Essentially, if the following calculation {Math.round((result.score / 89).toFixed(2) * 100)}
is 0 -> 24 I would like to make the pathColor:
in CircularProgressbar
red, if 25 -> 50 I would like to make it yellow and if it's 51 -> 100 I would like to make it green. What is the easiest way to do this?
ANSWER
Answered 2022-Apr-14 at 07:50You can make some class "red", "yellow", "green" and add one of them to your progress bar depending on the value.
QUESTION
I think I'm not accessing the property src correctly, this can be found in all the objects in a line like this one
logo: src={imgrep(1)} alt="altofem"
whenever I try to render them accessing the src, I get the error × typeerror cannot read property of undefined (reading 'props')
I have been stuck for a week since this error comes and go :(, thank you in advance!
...ANSWER
Answered 2021-Dec-24 at 15:22Class Component
QUESTION
const useProgress = (maxTimeInSeconds = 30) => {
const [elapsedTime, setElapsedTime] = useState(0);
const [progress, setProgress] = useState(0);
useEffect(() => {
const intervalId = setInterval((callback) => {
if (progress < 1) {
setElapsedTime((t) => t + 1);
}
}, 1000);
return () => clearInterval(intervalId);
}, []);
useEffect(() => {
setProgress(elapsedTime / maxTimeInSeconds);
console.log(elapsedTime);
}, [elapsedTime]);
return progress;
};
const progress = useProgress();
...ANSWER
Answered 2021-Dec-22 at 23:57progress
does not need to be a state atom since it's always unambiguously calculable from the elapsed time and max time.
Using the modulo (remainder) operator you can have the observed progress always loop back to 0 after the maximum time.
QUESTION
I'm trying to make each logo from the Arr professions display on click certain information from each client. the furthest I have gone is to make each logo display its own logo. IDK if I'm not acceding the properties correctly but I haven't been able to render the information cards
...ANSWER
Answered 2021-Dec-19 at 22:10Merge your datasets together like this:
QUESTION
Whenever I run the project on the emulator, it gives me the error App keeps stopping and I can't run the app. There was no error when debugging the code. So I checked on the Logcat then it gives me the error java.lang.RuntimeException. I have no idea where the error is or is it a problem of the code at all? Please someone help me...
Main Activity code
...
ANSWER
Answered 2021-Dec-12 at 10:50You're calling setProgressWithAnimation
on a null object. I suggest you not use findViewById
. Use ViewBinding or at least kotlinx.
QUESTION
I would like to achieve semi-circle progress bars but I don't have enough experience in visual studio, I did find a circular progress bar Nuget pack that is possible to do full circle but I couldn't find a way to succeed in making half one (even tried to modify source code of CircularProgressBar Nuget pack), is there anyone can give tip or way of achieving that. Thanks.
What circular progress bar Nuget pack offers
Half-circular progress bar that I am trying to implement on my design
...ANSWER
Answered 2021-Dec-03 at 09:17It is may be not the best solution, but you can add a panel over the lower half of the circular progress bar item. Then set the StartAngle
to 180 and the Maximum
to the double of your maximum reachable value. Here a little snip of an example (quick and dirty):
QUESTION
I'm looking at this repo for a progress bar, and this code in particular is given as an example for a bar with animated bar and text transitions:
...ANSWER
Answered 2021-Oct-18 at 12:50Figured out the answer to this for anyone wondering. It's the value end variable that determines the "current" value and the "value start" is where the animation begins on page load
QUESTION
I have a UIViewController with Circular Progress Bar View and restart button. The problem is that when I try to restart animation I can't add it again.
In my restartButton( _ sender: UIButton) function I use "progressLayer.removeAllAnimations()" and my stroke totally dissapear (and it's ok because I remove animation), but after that I use "addAnimation" function which should add the animation again but it doesn't happen (the stroke doesn't start again).
And what is surprising in viewDidAppear addAnimation() function works properly but in restartButton it doesn't, like it could not add animation again after using removeAllAnimations()
It's my view with circular progress bar
...ANSWER
Answered 2021-Oct-12 at 01:49It's because you're doing the animation incorrectly. These lines are totally wrong:
QUESTION
I'm having a problem where I want to display a circular loading progress bar for when the recycler view is loading and only display recyler view when it is fully loaded, because when I search for an item in recycler view it crashes giving me the error:
java.lang.IndexOutOfBoundsException: Inconsistency detected. Invalid item position 1(offset:1).state:8077 androidx.recyclerview.widget.RecyclerView{e6252d0 VFED....
The only way to not get the crash is to wait for around 4 seconds and scroll a little bit till it fully loads. And activity only opens when it can visibly display recycler view which also gives it a delay.
So how do I fix this error, maybe by displaying recycler view and search bar only after it is fully loaded?
...ANSWER
Answered 2021-Jun-23 at 21:30Is there a chance that the data that you are attempting to display in your RecyclerView is being modified in a different thread somewhere else? That would likely account for the Inconsistency detected
error message that you are seeing.
If you are filtering the data in the RecyclerView through a search, make sure that you call notifyDataSetChanged()
afterwards to refresh the data in the RecyclerView.
You don't show where you are calling getFilter()
, but it doesn’t appear to be using the notifyDataSetChanged()
within the publishResults()
method. Depending on how your code is structured, try calling notifyDataSetChanged()
where you return the data from return filterResults
.
QUESTION
I want to show a CircularProgressBar
when the initState
method loads data before I navigate to HomePage
.
My Code:
ANSWER
Answered 2021-Jun-21 at 08:46By default display ProgressIndicator, and after data loaded display HomePage(). Use FutureBuilder or add in your model state variable bool isLoading.
Community Discussions, Code Snippets contain sources that include Stack Exchange Network
Vulnerabilities
No vulnerabilities reported
Install CircularProgressBar
Support
Reuse Trending Solutions
Find, review, and download reusable Libraries, Code Snippets, Cloud APIs from over 650 million Knowledge Items
Find more librariesStay Updated
Subscribe to our newsletter for trending solutions and developer bootcamps
Share this Page