icalendar | Library for reading and writing iCalendar files in PHP | Calendar library
kandi X-RAY | icalendar Summary
kandi X-RAY | icalendar Summary
The Zap Calendar iCalendar Library is a PHP library for supporting the iCalendar (RFC 5545) standard.
Support
Quality
Security
License
Reuse
Top functions reviewed by kandi - BETA
- get all dates
- Returns the TZNode for the given start year .
- Set by day
- export a node
- Get absolute date
- Returns a list of time zone values .
- Convert a duration to seconds
- Short description of method printDataLine
- Returns the first child event
- Get parameters .
icalendar Key Features
icalendar Examples and Code Snippets
Community Discussions
Trending Discussions on icalendar
QUESTION
I'm trying to figure out how to take an icalendar file from AirBnB, iterate through the values and then insert those in our MySQL DB.
I'm able to parse the ical file with results using the PHP Class iCalEasyReader with the following results:
...ANSWER
Answered 2021-Jun-11 at 23:11Based on your current array structure, you need to do
QUESTION
Trying to format data from ics calendar file to any outpu such as json or even python print()
. Looking for good ways to replace special characters without losing readability and having ascii-like characters. Examples below. Any tips?
Summary field value in ics file
...ANSWER
Answered 2021-May-06 at 20:57with open("events.json", mode="w", encoding="utf-8") as f:
json.dump(events, f, indent=2, ensure_ascii=False)
QUESTION
I have a ContentPage
with 2 different ViewModels (RssFornecedores
, RssProdutos
) and I am having problems binding them in the same ContentPage
I tried to do something like this:
Multiple BindingContext's On Same ContentPage, Two different Views?
But it didn't work because of the following error:
Type 'viewModels:RssProdutos' is used like a markup extension but does not derive from MarkupExtension
And if I add as a StaticResource
BindingContext="{Binding Produto, Source = {StaticResource viewModels:RssProdutos}}"
I get the error:
StaticResource not found for key staticviewModels:RssProdutos'
Documentos.xaml:
...ANSWER
Answered 2021-May-02 at 14:28- If you don't have an instance of it already in your code, you need to create an instance of
RssProdutos
as a resource in your xaml by giving it a key:
QUESTION
I'm currently using iCalendar specification (RFC 5545) to deal with recurring events.
Until yesterday, their recurrence rules covered all my needs, but now I'm having a hard time implementing the following rule:
Every month on the first Monday OR Wednesday of the month.
Ex:
- 2021-05-01 is Saturday: the event will happen on Monday 2021-05-03.
- 2021-06-01 is Tuesday: the event will happen on Wednesday 2021-06-02.
- 2021-07-01 is Thursday: the event will happen on Monday 2021-07-05.
- 2021-08-01 is Sunday: the event will happen on Monday 2021-08-02.
Is there a way to define this kind of "conditional" rule?
...ANSWER
Answered 2021-Apr-26 at 05:38If I understand the requirement correctly, it is not exactly conditional. It is that ONLY the first of the first Monday and first Wednesday is required. BYSETPOS is aimed at this.
In this example, it is being used to calculate the last working day https://icalevents.com/2555-paydays-last-working-days-and-why-bysetpos-is-useful/
For your example
RRULE:FREQ=MONTHLY;BYDAY=1MO,1WE;BYSETPOS=1
should do the trick,
Basically the RRULE will expand out all the first MONDAY and WEDNESDAYs and then 'contract' ie take the first date of each pair.
Page 43 of the specification https://www.ietf.org/rfc/rfc5545.txt shows the priorities of the 'expansions' and 'contractions'.
QUESTION
I'm trying to send .ics
calendar invites through SendGrid (from Node server) so that it renders in clients like Outlook or Gmail as an actual invitation (with accept/decline buttons) and not just as an attachment file.
I've spent days researching this (dozens of Stackoverflow questions, RFC-5545, RFC-2446, iCalendar Specification Excerpts, Sendgrid's GitHub issues threads: 1, 2, 3, SendGrid docs, sources etc).
However, there just doesn't seem to be an answer for this (or am I missing something out?).
What I've found so far is that Content-Type
for the attachment is very important here, especially, method=REQUEST
part. And that even the order of properties in the file makes difference.
Despite a lot of questions here on SO, most of them remain unanswered for some reason.
Here's how I set up my attachment
object:
ANSWER
Answered 2021-Apr-19 at 19:58Okay, so after a lot of trial and error I finally got this working. I hope the code will be helpful to others.
So, firstly, what I did was send an actual event invite from iCalendar and receive this .ics
invite (which actually got rendered in both Outlook and Gmail). I looked at how this file was different from what I was generating and found a curious thing:
the key to get this working was...
MAGIC STRINGS
Yeah, totally random, weird magic strings.
Below I'm posting the .ics
file content that worked for me.
TOTTALLY-RANDOM-MAGIC-STRING
- is a placeholder for a totally random strings like uuids or maybe your organisation emails or anything else.
The key is: with these strings in the file Outlook and Gmail render the invite correctly, and without them - don't. Weird, but working.
I wasn't able to find anything meaningful about this in the docs or RFCs, so I guess it's safe for now to call these magic strings.
The first magic string is TOTTALLY-RANDOM-MAGIC-STRING@imip.me.com
.
And the second magic string is /TOTTALLY-RANDOM-MAGIC-STRING/principal/
.
QUESTION
I'm looking for a profound explanation what exactly the difference between TZOFFSETFROM and TZOFFSETTO in an iCalendar description is and how to calculate it.
While it is described here: https://tools.ietf.org/html/rfc5545#section-3.6.5 [Page 65] I can't wrap my head around the meaning and especially how to calculate it. I have a list of all timezones and their related UTC_offset_StandardTime and UTC_offset_DaylightSavingTime but there is no "…onset…"-time.
While there is a somehow answer https://stackoverflow.com/a/3872214 I can't find a resource which proves that this right.
What am I missing?
...ANSWER
Answered 2021-Mar-02 at 06:26Re: "How to calculate the timezone offset":
It is not 'calculated', but rather looked up - most systems have this information built in using the Olson timezone database, and kept (hopefully) up to date. The systems or languages usually have a function to get the offset for a given date and time. EG:
- in php https://www.php.net/manual/en/datetime.getoffset.php. or one can get all the transitions to output to a VTIMEZONE https://www.php.net/manual/en/datetimezone.gettransitions.php
- general comment here https://en.wikipedia.org/wiki/Time_zone#Computer_systems
Most systems maintain such a db. Usually there is a recurring rule that always is so, however countries and areas may change the date of daylight saving change. See https://en.wikipedia.org/wiki/Daylight_saving_time_in_Australia#Western_Australia and changes made for the Olympics. This would mean an extra set of VTIMEZONE DST transition definitions for those areas, with DTSTARTS and UNTIL's on any recurring rules to indicate over what years they apply or do not apply.
Now the .ics specification says we must include these timezone transitions - the daylight saving changes in a VTIMEZONE definition in the file.
That leads us to your other question:
RE: what is TZOFFSETFROM and TZOFFSETTO?
They are literally for each transition date generated by the RRULE (or just a date if not recurring if it was a one-off), relative to UTC or GMT:
- the OFFSET FROM which a daylight saving change is coming and
- the OFFSET TO which a daylight saving change is going
Take the New York 2021 daylight savings change on 14 March. The timezone offset is -5. After 14 march 2021 2 am, the timezoneoffset will be -4. See https://www.timeanddate.com/time/zone/usa/new-york-state.
So If we look at what google calendar outputs, we see that on the second sunday of march at 2am, Daylight saving begins, NY goes
- FROM -05 and
- TO -04.
Then when they revert to Standard Time on the 1st sunday in November, NY goes
- FROM an offset of -04 and
- TO an offset of -05.
NOTE that both (a FROM and a TO offset) are required because the change is NOT always by an hour. Sometimes the change may be 30 minutes. See https://www.timeanddate.com/time/time-zones-interesting.html and scroll down near the bottom. You'll see Lord Howe Island had a 1/2 hour change and further down under 'Historic half hour offsets' what North Korea did in 2015 and Venezuela in 2016.
Google Calendar New York example:
QUESTION
I'm using iCalendar to schedule events for Gmail users. However, I want to be able to send updates, if/when the event changes. I read that I must use METHOD:REQUEST in order to allow updates.
However, when I add the METHOD:REQUEST to my ics file, Gmail stops recognizing it as a calendar invite.
Here is the working example WITHOUT "METHOD:REQUEST"
...ANSWER
Answered 2021-Feb-11 at 08:44Ok - After many hours of reading RFC5546, Stackoverflow, and many other blogs, I finally have the answers.
Scope:
- Sending calendar invites to Gmail / Outlook / Privateemail (namecheap's email client)
- Email clients automatically recognizing .ics files and generating "accept" templates
- Events automatically appearing in client calendars as "tentative"
- Sending event revisions that automatically move client calendar events
There are two fundamental principles that are critical to making this work:
The contents of the .ics file must very closely match the .ics file of the Gmail / Outlook community, this includes the parameters and the order of the parameters.
The way the .ics file is attached to the email transmission is odd but critical: (a) the .ics file must be turned into 'base64', and (b) the headers of the file need to give a type: 'text/calendar;method=REQUEST;name="file.ics"'
Below I will give examples of each, which I hope save others time on this process.
.ics Content Example:
QUESTION
I'm using icalendar to parse an .ics file with Python. I have the loop to walk the events and I can read the start and end date, the summary and attendees. My problem is that I can't figure out how to read/parse the CATEGORIES entry. Here's my code
...ANSWER
Answered 2021-Feb-05 at 01:22Try this:
QUESTION
I am using the ical-generator library to publish an iCalendar feed. The calendar contains an all-day event, which is a prediction of something happening on a given day. As the prediction gets updated, I want to change the date of the event accordingly.
This is how the feed looks like for an example event on 21 Feb 2021:
...ANSWER
Answered 2021-Jan-26 at 15:28Turns out that everything is working as expected, but – just as @anmari pointed out in a comment – receiving applications check at their own pace.
QUESTION
Hi how can i get attachments and send it to my java server?
in docs its say:
ANSWER
Answered 2021-Jan-13 at 15:12Most likely what is happening is that you are trying this code on a read item. The getAttachmentsAsync
fn only exists in compose mode, so you would see the error above if you are not composing an email. For read emails you should be able to just access the attachments property Office.context.mailbox.item.attachments
(https://docs.microsoft.com/en-us/javascript/api/outlook/office.attachmentdetails?view=outlook-js-preview)
Community Discussions, Code Snippets contain sources that include Stack Exchange Network
Vulnerabilities
No vulnerabilities reported
Install icalendar
PHP requires the Visual C runtime (CRT). The Microsoft Visual C++ Redistributable for Visual Studio 2019 is suitable for all these PHP versions, see visualstudio.microsoft.com. You MUST download the x86 CRT for PHP x86 builds and the x64 CRT for PHP x64 builds. The CRT installer supports the /quiet and /norestart command-line switches, so you can also script it.
Support
Reuse Trending Solutions
Find, review, and download reusable Libraries, Code Snippets, Cloud APIs from over 650 million Knowledge Items
Find more librariesStay Updated
Subscribe to our newsletter for trending solutions and developer bootcamps
Share this Page