wbs | start Go server auto-reloader | Configuration Management library
kandi X-RAY | wbs Summary
kandi X-RAY | wbs Summary
Watch, build, and (re)start Go net/http server, customizeable by toml configuration file.
Support
Quality
Security
License
Reuse
Top functions reviewed by kandi - BETA
- main starts the main watcher .
- initWatcher initializes the watcher .
- NewWatcher returns a new fsnotify watcher
- NewDefaultConfig returns a default config with default values .
- matchContains returns true if v contains the given string .
- NewConfig returns a new Config struct
- NewBuilder returns a new builder .
- NewLogFunc returns a function that logs a message with a given prefix .
- NewRunner returns a new Runner .
- loggingMiddleware logs the request to the next handler .
wbs Key Features
wbs Examples and Code Snippets
Community Discussions
Trending Discussions on wbs
QUESTION
I am working on a work breakdown / Gantt chart type of spreadsheet where I need to know the number of hours planned for certain resource types during a certain period. An example spreadsheet might look like this:
I know I can do something like =SUMIF($C$3:$C$8, "Dev", D3:D8)
that will give me the sum for all things in row D3 to D8 when the resource type is "Dev", for example the value in cell D10. Similary =SUMIF($C$3:$C$8, "Tester", F3:F8)
will give me the number 6 in cell F11 and by doing =SUM(D10:H10)
, I will get the number of hours for Dev in cell H13 and similarly for H14 for the Tester Hours sum.
I am trying to eliminate the middle steps for summing first each column and then summing again from the resulting data from D10 and H10, etc.
I know =SUM(D3:H8)
is possible, but this will not allow me to differentiate the Dev Hours vs Tester Hours. I am unable to do something like =SUMIF($C$3:$C$8, "Dev", $D$3:$H$8)
for some reason to get me the 14 hours I am expecting for Dev.
I tried multiple things using ARRAYFORMULA
and SUMIF
and that too didn't work out.
Anyone know if this is even possible without doing the intermediate step?
...ANSWER
Answered 2022-Apr-10 at 17:53try:
QUESTION
I had similar question, that I posted over 1y ago, and it was basically solved but... Here is the link for more infos:
VBA CopySheetsFromClosedWorkbook but overwrite (update) existing sheets with new values
Recently I bumped on some issue where I am facing WBs with different Sheet names but with the same content. Every time I am having this issue I need to tweak a code a bit, to adjust it for right Sheet names. is there any function or additional array that I can include in the code so that it recognises if the Sheet1 had name XYZ and now ZYX to still proceed with code and get me the data?
In my case, also you can see in the code, it is only matter of two different names with numbering. Original Sheet name is "CH_or_Recipe_1 to 8", but sometimes I will have cases with "Chamber 1 to 8". I would like to have defined those Sheet names within my code so that I dont need to adjust it manually every time I wanna copy the data.
And last additional question or favor is, to export the exact WB but without .xlsm (without macro) in .xlsx with all the data. So Macro WB would be like an intermediar to gather the data and export them...
This is coding part:
...ANSWER
Answered 2022-Mar-18 at 15:54Change the sheets names for those ending in a number 1 to 8
QUESTION
Ho can I make the resource names appear in the task reports? There is a column 'resources' that I simply use as such:
...ANSWER
Answered 2022-Mar-14 at 17:52You can add parameters to the resources column specification. This does the trick:
resources { listitem "<-query attribute='name'->" }
QUESTION
I am creating part of one tool, which merges two SAP exports into one.
I know how many account numbers might be in the export (not all of them every month) and I have it almost complete except for the find issue, when account number is not in dataset, but is found and data merged are from the last exported account number
...ANSWER
Answered 2022-Mar-11 at 13:18Problem in here
QUESTION
I have created a form which can be dynamically changed using the buttons included. These buttons allow for more input fields to be added/removed. The issue is that the input fields created are not posting any data/ Values in those fields not being added to the $POST array on the submit of the form.
The main functions below resposible for adding and removing rows is RemoveRows() and addRows()
What should happen is that on submit all values in the form should be "posted" then I can access all of those fields via $_POST["nameOfField"].
The way I have currently approached this is to create an input fields with the relevant id's and names then append that field to where the "hard coded" fields exists.
From my initial debugging none of the fields that have been added via javascript are in $Post which I have checked via var_dump($_REQUEST);
I have also seen that the nodes that are added are not elements of the form tag even though the nodes are added between the opening and closing tag. This can be seen in the doBeforeSubmit() Function where we can see all elements that are children of the and this never changes as rows are added/removed.
...ANSWER
Answered 2022-Jan-24 at 16:36You just need to use the name
property of the input and add []
at the end, as GrumpyCrouton said. PHP parse it as an array, and you can access it as:
QUESTION
I have a js array like this
...ANSWER
Answered 2022-Jan-24 at 20:29QUESTION
I've got a code that generates a workbook by copying and moving selected worksheets into a new workbook. The first page of this new workbook is a summary page. On this i want to pull data from the subsequent worksheets by using the range.value method. However can I use this when referencing the worksheet location for example
...ANSWER
Answered 2021-Nov-29 at 16:56This may help:
EDIT: updated to show using links instead of copying the values from the sheet.
QUESTION
ANSWER
Answered 2021-Sep-13 at 12:19Add the
QUESTION
I am trying to run the following docplex.cp.model
with a large dataset. This is with some sample data:
ANSWER
Answered 2021-Aug-24 at 14:42By default, the CPO solver starts as many workers than visible cores, including hyper-threading. Unfortunately, the memory consumption is nearly proportional to the number of workers, which explains your "out-of-memory".
You should limit this number by adding for example Workers=4 in your solve request, that would become in your case:
QUESTION
Anyone have an idea how to sort the records according to their index number (wbscode)
If I use ORDER BY after 1.1.9 it does not continue 1.1.10 changes to 1.2 I can't find a correct way to do a consecutive order of this.
someone knows a way to do it correctly ie
1
1.1.1
1.1.2
1.1.3
1.1.4
1.1.5
1.1.6
1.1.7
1.1.8
1.1.9
1.1.10
1.1.11
1.2
1.2.1
2
.....
SELECT wbs FROM houses ORBER BY wbs :(
ANSWER
Answered 2021-Aug-19 at 21:28You can use the datatype hierarchyid
Example
Community Discussions, Code Snippets contain sources that include Stack Exchange Network
Vulnerabilities
No vulnerabilities reported
Install wbs
Support
Reuse Trending Solutions
Find, review, and download reusable Libraries, Code Snippets, Cloud APIs from over 650 million Knowledge Items
Find more librariesStay Updated
Subscribe to our newsletter for trending solutions and developer bootcamps
Share this Page